Commit Graph
3 Commits
Author SHA1 Message Date
rich a9980648bf sb-lora: correct U1-U7 rotations in CPL for JLC part models
Checked in JLC's placement preview: U1, U2, U4 needed a 90 deg clockwise
turn (270) and U3, U5-U7 a 180 deg turn for pin 1 to land on the pin-1
pad. Y1 and D1 were already correct.
hw-v0.1
2026-10-30 14:23:39 -04:00
rich cf22b6dbde sb-lora: replace out-of-stock crystal with SX3B14.7456F2010F30 (C2901666)
SXT32413BA07 (C6264361) is out of stock at LCSC. Same 14.7456 MHz and
3225-4P footprint; 20 pF load vs 13 pF, so with the existing 22 pF caps
it runs a few tens of ppm high, which is irrelevant for UART timing.
2026-10-30 13:57:15 -04:00
rich b1b2171852 Initial import: SB-LoRa v0.1 hardware, MeshCore UART patch, design docs
Organize the planning-session outputs into hardware/, firmware/,
palm-client/ and docs/, with design notes and a progress tracker.
2026-10-30 13:33:31 -04:00