progress: SB-LoRa v0.1 ordered from JLCPCB
This commit is contained in:
1 parent
a9980648bf
commit
3ec4770bf3
1 file changed
+7
-2
+7
-2
@@ -4,8 +4,9 @@
|
||||
|
||||
### Hardware: SB-LoRa v0.1
|
||||
- [x] Board designed, DRC clean, fab package generated
|
||||
- [ ] Check part rotations in JLC preview (U1–U7, Y1, D1)
|
||||
- [ ] Order PCBs + assembly (2-layer, 1.6 mm, ENIG)
|
||||
- [x] Check part rotations in JLC preview (U1–U7, Y1, D1); corrections saved to the CPL
|
||||
- [x] Order PCBs + assembly from JLCPCB (5 boards, 2-layer, 1.6 mm, leaded HASL); tagged `hw-v0.1`
|
||||
- [ ] Boards received
|
||||
- [ ] Order J1 (Hirose IC1HA-68RD-1.27SH(51), DigiKey HR1187-ND) and 2x 1x7 female headers
|
||||
- [ ] Bare board: continuity check, dry-fit in Visor slot
|
||||
- [ ] Fit J1, bench-power VSB at 3.3 V, check current and 14.7456 MHz on Y1
|
||||
@@ -34,3 +35,7 @@
|
||||
### 2026-10-30
|
||||
- Planning done in claude.ai. Chose a custom Springboard module (SB-LoRa) over cradle serial/IR.
|
||||
- SB-LoRa v0.1 fab package generated. Repo set up and files organized.
|
||||
- Crystal Y1 swapped to SX3B14.7456F2010F30 (C2901666, 20 pF load) because C6264361 was out of stock.
|
||||
- JLC placement preview showed U1, U2, U4 a quarter-turn off and U3, U5–U7 a half-turn off. Fixed in the preview and in the CPL (270 / 180).
|
||||
- Chose leaded HASL over ENIG (+$18). JLC does the fine-pitch assembly, so pad flatness isn't critical.
|
||||
- PCB + assembly order placed with JLCPCB. `hw-v0.1` tag moved to the ordered commit.
|
||||