From 3ec4770bf3130c7ef798c1feff0fb9a1e5828347 Mon Sep 17 00:00:00 2001 From: "Rich O." Date: Fri, 30 Oct 2026 14:48:49 -0400 Subject: [PATCH] progress: SB-LoRa v0.1 ordered from JLCPCB --- docs/progress.md | 9 +++++++-- 1 file changed, 7 insertions(+), 2 deletions(-) diff --git a/docs/progress.md b/docs/progress.md index cf54415..f633de8 100644 --- a/docs/progress.md +++ b/docs/progress.md @@ -4,8 +4,9 @@ ### Hardware: SB-LoRa v0.1 - [x] Board designed, DRC clean, fab package generated -- [ ] Check part rotations in JLC preview (U1–U7, Y1, D1) -- [ ] Order PCBs + assembly (2-layer, 1.6 mm, ENIG) +- [x] Check part rotations in JLC preview (U1–U7, Y1, D1); corrections saved to the CPL +- [x] Order PCBs + assembly from JLCPCB (5 boards, 2-layer, 1.6 mm, leaded HASL); tagged `hw-v0.1` +- [ ] Boards received - [ ] Order J1 (Hirose IC1HA-68RD-1.27SH(51), DigiKey HR1187-ND) and 2x 1x7 female headers - [ ] Bare board: continuity check, dry-fit in Visor slot - [ ] Fit J1, bench-power VSB at 3.3 V, check current and 14.7456 MHz on Y1 @@ -34,3 +35,7 @@ ### 2026-10-30 - Planning done in claude.ai. Chose a custom Springboard module (SB-LoRa) over cradle serial/IR. - SB-LoRa v0.1 fab package generated. Repo set up and files organized. +- Crystal Y1 swapped to SX3B14.7456F2010F30 (C2901666, 20 pF load) because C6264361 was out of stock. +- JLC placement preview showed U1, U2, U4 a quarter-turn off and U3, U5–U7 a half-turn off. Fixed in the preview and in the CPL (270 / 180). +- Chose leaded HASL over ENIG (+$18). JLC does the fine-pitch assembly, so pad flatness isn't critical. +- PCB + assembly order placed with JLCPCB. `hw-v0.1` tag moved to the ordered commit.